Career profile includes municipal service
beginning with the Fire Department,
then progressing to the Building
Department, finally transitioning to the
private sector field of Construction
Management. High profile construction
management projects include:
Three-story mixed-use heavy timber wood
podium consisting of 81 apartments over
parking gara
Career profile includes municipal service
beginning with the Fire Department,
then progressing to the Building
Department, finally transitioning to the
private sector field of Construction
Management. High profile construction
management projects include:
Three-story mixed-use heavy timber wood
podium consisting of 81 apartments over
parking garage and retail; highlighted
as a case study for horizontal separation
in WoodWorks heavy timber
construction seminar and several trade
articles. Five-story wood over 2 story
concrete podium mixed-use projects,
including; The Hardin, residential tower
at 700 K Street featured as Sacramento
Business Journals Project of the Year in
2019, Bel Vue apartment building
rehabilitation project.
CONTACT
PHONE:
530-701-3362
EMAIL:
Certified Building Inspector (B5), ICC,
#5055111-10
Certified Electrical Inspector (E5), ICC,
#5055111-20
Certified Plumbing Inspector, IAPMO
#098002
HOBBIES
Fishing, Paintball, Trap Shooting,
Jeep/UTV
PLACE OF WORSHIP
Ozark Mountain Community Church,
Blue Eye, MO
EDUCATION
Butte Community College
1996 - 2001
Earned degrees in Fire Academy and Building Inspection Technology
Construction Project Management
Manage all aspects of construction and development from entitlement
stage through certificate of occupancy for large-scale residential & commercial new construction projects. Secure budget bid estimates from
construction trade contractors to formulate development project budget
estimates. Provide construction s
Construction Project Management
Manage all aspects of construction and development from entitlement
stage through certificate of occupancy for large-scale residential & commercial new construction projects. Secure budget bid estimates from
construction trade contractors to formulate development project budget
estimates. Provide construction schedule, budget, and logistics reports to investors.
Conduct bid solicitation/selection and finalize construction contracts. Collaborate with design professionals, and identify potential
conflicts with design features in consideration of means and methods, facilitate design and implementation of value engineering.
Coordinate with City, County, and State agency officials to secure all required permits
and with all local utilities for service applications and installations. Chart out construction schedule, set performance requirements and ensure
adherence to both by all sub-contractors and vendors. Resolve conflicts relating to construction issues, and disputes with code officials and contractor operations. Identify and eliminate elements of project design and construction likely to result in dispute, conflict, additional expense, and,/or change orders. Supervise construction superintendents, oversee job site administration matters relating to personnel and payroll, and, review and approve change orders. Optimize utilization of resources, labor, materials
and equipment, and ensure their procurement at the most cost-effective terms. Ensure HUD, HOME OSHA, and ADA compliance.
Lifestyle Contractors, Director of Operations
2021-2024
Master Construction, Construction Project Manager
2020–2021
CFY Development, Inc. Construction Project Manager
2007–2020
KB Home, Superintendent
2005–2006
Building Inspector
Oversee, schedule, and coordinate field inspection activities, provide training to new inspection staff, inspect complex structural building systems
at various stages of construction, resolve disputes between division staff and developers, contractors, architects, engineers, superintendents, and the general public, and provide combination building and structural reviews of commercial building plans and review engineered field changes.
City of Yuba City, Supervising Building Inspector
2002–2005
Sierra County, Building Inspector
2001–2002
Colusa, CA
2008
Multi-phased development to fill the need for affordable housing, first phase completed in
2008 providing 81 units of new affordable family units.
Project challenges included involvement with
native American tribal council for evaluation of Indian artifacts discovered during the excavation phase of development.
Coordination w
Colusa, CA
2008
Multi-phased development to fill the need for affordable housing, first phase completed in
2008 providing 81 units of new affordable family units.
Project challenges included involvement with
native American tribal council for evaluation of Indian artifacts discovered during the excavation phase of development.
Coordination with archeologists had minimal impact on the construction schedule and work proceeded during archeological excavation to recover, document, and restore artifacts to discovered locations prior to replacing dirt cover of excavated site.
Sacramento, CA
2008
Award-winning, adaptive reuse of an abandoned historic flour mill into lofts, senior housing, and commercial uses. The $38-million Globe Mills project in Sacramento transformed a long-abandoned historic industrial site into a thriving residential community with 112 affordable senior apartments, 31 contemporary lofts, and
Sacramento, CA
2008
Award-winning, adaptive reuse of an abandoned historic flour mill into lofts, senior housing, and commercial uses. The $38-million Globe Mills project in Sacramento transformed a long-abandoned historic industrial site into a thriving residential community with 112 affordable senior apartments, 31 contemporary lofts, and neighborhood-oriented commercial
spaces. The transit-oriented, green
and sustainable infill project succeeds through historic adaptive reuse and new construction in a public/private partnership.
http://appliedarts.net/Globe%20Mills.htm
https://www.bizjournals.com/sacramento/stories/2008/09/15/daily83.html
Crescent City, CA
2009
Phase 1 and 2015 Phase 2
Phased development of 162 housing units completed in 2 phases, each consisting of 5+
acre parcel development with 10 two-story apartment buildings containing 81 family units, a
community building, and a garage in Crescent City, Del Norte County, California. Project challenges included heavy in
Crescent City, CA
2009
Phase 1 and 2015 Phase 2
Phased development of 162 housing units completed in 2 phases, each consisting of 5+
acre parcel development with 10 two-story apartment buildings containing 81 family units, a
community building, and a garage in Crescent City, Del Norte County, California. Project challenges included heavy involvement of the Environmental Protection Agency, Department of Water Resources, and Army Core of Engineers due to wetlands, natural streams, and bridge construction requirements to accommodate access to the
developed site.
Elk Grove, CA
2010
84 Family Unit
Complex
Galt, CA
2012
81 Senior Units above ground level parking garage and 10,000 square feet of office and retail space.
http://appliedarts.net/aagallery/?cat=246
Three-story all-wood podium featured in multiple seminars presented by
Am
Galt, CA
2012
81 Senior Units above ground level parking garage and 10,000 square feet of office and retail space.
http://appliedarts.net/aagallery/?cat=246
Three-story all-wood podium featured in multiple seminars presented by
American Wood Council and WoodWorks including:
Codes and Standards for Mid-rise Construction An All Wood Solution, All Wood
Podiums in Midrise Construction Seminar Presentation, Wood Podium
Mixed Use Design, Exposing the Potential of Heavy Timber Construction,
Wood Podium Mixed Use Design, An Architectural Case Study by
WoodWorks.
and trade articles:
https://www.constructionspecifier.com/designing-all-wood-podiums/
https://www.apawood.org/mid-rise-construction
https://www.probuilder.com/blog/glulam-helps-builders-meet-booming-demand-multifamily-construction
Coalinga, CA
2012
Warthan Place; 5+ acre parcel
development with 10 two-story
apartment buildings containing 81new
affordable family units, a community
building and a garage in Coalinga, CA.
Sacramento, CA
2014
A three-building, 200,000 sq. ft.
rehabilitation project transforming a
100-year-old warehouse building into
artist loft housing units that served as
the catalyst for the redevelopment of
historic R Street Corridor in downtown
Sacramento.
http://appliedarts.net/aagallery/?page_id=1724
Sacramento, CA
2014
A three-building, 200,000 sq. ft.
rehabilitation project transforming a
100-year-old warehouse building into
artist loft housing units that served as
the catalyst for the redevelopment of
historic R Street Corridor in downtown
Sacramento.
http://appliedarts.net/aagallery/?page_id=1724
https://www.downtownsac.org/project/warehouse-artist-lofts-wal/
Sacramento, CA
2017
Five-story wood frame over 2-level
concrete parking podium married with
renovation of 75,000 sq. ft. of historic 4-story
buildings containing 237,445 sq. ft. of
building area consisting of 137 dwelling
units, 5,602 sq. ft. community center, 57,525 sq. ft. restaurant and retail.
Sacramento, CA
2017
Five-story wood frame over 2-level
concrete parking podium married with
renovation of 75,000 sq. ft. of historic 4-story
buildings containing 237,445 sq. ft. of
building area consisting of 137 dwelling
units, 5,602 sq. ft. community center, 57,525 sq. ft. restaurant and retail.
https://kuchman.com/work/700-block-sacramento-ca-urban-mixed-use-apartments-and-commercial-2/
https://www.sacramentopress.com/2011/01/05/k-streets-700-block-to-get-entertainment-housing/
https://www.sacramentopress.com/2011/01/05/k-streets-700-block-to-get-entertainment-housing/
https://www.sactownmag.com/special-k/
https://www.downtownsac.org/project/700-block-of-k-street/
https://livinginurbansac.blogspot.com/2018/12/700-k-street-harlin.html
Jason had the opportunity to bring his oldest son on board during the 700 K project. He is pictured above, alongside his son Kaelan, at work on the 700 K project. He has been richly blessed with the opportunity to sow into the life skill and character development of his sons.
His younger son Kieran, while still in High School, would work as a laborer during the summer, learning the value of hard work and developing a strong work ethic. Kieran is pictured above at the job site showing no hesitation in the face of hard work.
Sacramento, CA
2018
Adaptive re-use and preservation of the
historic Bel-Vue Apartments in downtown Sacramento, 22 workforce housing units, and 4,500 square feet of ground floor retail space.
https://www.kcra.com/article/sacramento-developments-luxury-affordable-housing-california/28918441
https://californiapreservation.org/awards/bel-vue/
h
Sacramento, CA
2018
Adaptive re-use and preservation of the
historic Bel-Vue Apartments in downtown Sacramento, 22 workforce housing units, and 4,500 square feet of ground floor retail space.
https://www.kcra.com/article/sacramento-developments-luxury-affordable-housing-california/28918441
https://californiapreservation.org/awards/bel-vue/
Truckee, CA
2019
The project incorporates pre-manufactured modular units by
Factory OS stacked into four stores
comprising 77 mixed-income
workforce housing units and 3,735
square feet of ground floor retail and
community space in the Truckee Railyard.
Prior to departure from California, having accomplished the planning
and design with entitlements and permits secured, these construction
projects would be delayed by COVID:
800 Block Mixed-Use Project; 150 mixed
income apartments and 20,000 square
feet of ground floor retail in downtown
Sacramento.
https://www.nba.com/kings/news/800-block-mixed-use-project/
https://livinginurbansac.blogspot.com/2018/12/
Four and five-story wood
frame over a 2-level concrete
podium. Mixed-used project with 159 residential units and 11,300 square feet of
ground-floor restaurant and retail space. About 40 percent of the units would
be designated affordable. Podium level courtyard 3,355 sq. ft. fourth-floor deck with a total of 236,408 sq. ft. of building area.
http://www.cadanet.org/projects/1717-s-street
https://kuchman.com/work/1717s-street-sacramento-ca/
Upon relocating his family to Missouri,
Jason considers his new chapter in life
to be “Crazy Blessed”. Each of his
vehicles sport the tagline as an
expression of his grateful heart and a
constant reminder of the true source
of the grace and favor he receives.
Branson, MO
2021
4-story condominium building
Branson, MO
2022
Nightly rental lodge complex
10 Acres/28 Units
Multiple amenity areas with indoor
pools and sport courts
Branson, MO
2022
Nightly rental lodge complex
10 Acres/43 Units
Community amenities include
indoor and outdoor pools and
playground.
Branson, MO
2023
A 50 Acre nightly rental resort complex development consisting of 60 buildings, 20 pools both outdoor and inside residences, 4 lazy rivers also outdoor as well as inside residences and built-in trampoline pits. Site amenities include paved roads and parking, landscaping with extensive soft-scape and hard-scape, multiple pla
Branson, MO
2023
A 50 Acre nightly rental resort complex development consisting of 60 buildings, 20 pools both outdoor and inside residences, 4 lazy rivers also outdoor as well as inside residences and built-in trampoline pits. Site amenities include paved roads and parking, landscaping with extensive soft-scape and hard-scape, multiple playgrounds, treehouses, pickleball courts, garages, entry monument, concrete and rock retaining walls. The total project valuation exceeds $50M with $36M in lodge buildings, $4M in 4-story condo building and
$10M in infrastructure.
Branson, MO
2023
4-story condominium building and nightly renal lodges
3.39 Acres/16 Condo units
and 5 lodges
Branson, MO
2023
Nightly rental lodge units
30 Units
Branson, MO 2024
The culmination of all his years of experience in the building and development industry inevitably led him to his current status as a development company owner.
Promoting STEM education, the VEX robotics competition series is the largest robotics competition for kids from elementary through high school. Tournaments are held year-round at the regional, state and national levels. As a building professional dealing heavily in the realm of structural engineering and a big supporter of engineering ed
Promoting STEM education, the VEX robotics competition series is the largest robotics competition for kids from elementary through high school. Tournaments are held year-round at the regional, state and national levels. As a building professional dealing heavily in the realm of structural engineering and a big supporter of engineering education, Jason served as a volunteer Judge at the regional VEX Robotics competitions held at Faith Christian High School in Yuba City, CA in 2018 and 2019.
The City of Yuba City’s H.A.N.D.S. (Helping Area Neighborhoods Develop Successfully) program engaged in targeted neighborhood revitalization involving general maintenance, light repairs, exterior improvements and landscaping enhancements. Funded by Community Development Block Grant (CDBG) funds, the volunteer labor of skilled professiona
The City of Yuba City’s H.A.N.D.S. (Helping Area Neighborhoods Develop Successfully) program engaged in targeted neighborhood revitalization involving general maintenance, light repairs, exterior improvements and landscaping enhancements. Funded by Community Development Block Grant (CDBG) funds, the volunteer labor of skilled professionals alongside unskilled volunteer workers compounded successful results and served to optimize the benefit to those in need of a helping hand breathe life back into the homes and yards in their neighborhood.
Volunteer overnight security at Moose Lodge fire evacuation center in Clear Lake Oaks during California Fires. Having displaced all residents from their homes, the evacuation center temporarily housed residents from all walks of life and backgrounds which unfortunately placed families in close proximity to individuals with behavioral or d
Volunteer overnight security at Moose Lodge fire evacuation center in Clear Lake Oaks during California Fires. Having displaced all residents from their homes, the evacuation center temporarily housed residents from all walks of life and backgrounds which unfortunately placed families in close proximity to individuals with behavioral or drug related issues. The families appreciated the security presence so they could get a good nights sleep while facing the challenge of recovery and rebuilding.
40 Days for Life, Life Chain event in Yuba City, CA
STATE OF JEFFERSON, STATE CAPITAL DEMONSTRATION, SACRAMENTO, CA
Sutter Buttes Tea Party Executive Board Member and frequent guest speaker.
Two runs for City Council in 2014 and 2016. In 2014, the election night results showing Rikard in the lead were slowly eroded over the following 2 weeks as mail-in ballots overtook his victory by less than a .25% margin. He would make one more attempt at the seat in the 2016 election at the urging of his supporters which led to the revea
Two runs for City Council in 2014 and 2016. In 2014, the election night results showing Rikard in the lead were slowly eroded over the following 2 weeks as mail-in ballots overtook his victory by less than a .25% margin. He would make one more attempt at the seat in the 2016 election at the urging of his supporters which led to the revealed purpose of his call being not for the win but rather for the journey and experience of the run.
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.